Walsh Group/Archer Western Construction: South Capitol Bridge-Washington, D.C.
When Archer Western needed a huge diesel hammer to drive 60" caissons for the new South Capitol Bridge in Washington, D.C., they knew exactly who to call. GeoQuip supplied a new GeoQuip-GPE D180-32 Diesel Hammer, along with a A104-66 offshore lead, a 66" step-style male helmet, and custom-built 74hp power unit to trip [...]


